|
|
Planning for the reservoir started in the 1960s with actual construction starting in 1979. In 1984 there was a partial collapse of the dam prior to it's filling. The dam was subsequently completely removed before construction of a new commenced in 1989. The finished reservoir was opened by Queen Elizabeth II in 1992.
The reservoir is a major centre of leisure activities including walking, cycling, birdwatching, sailing and windsurfing.